Environmental Successes For Individual Plants:

  • Fort Erie Durez Plant won OxyChem worldwide environmental award of excellence - Top plant in the world out of 40.

  • 60% reduction in Phenol liquid waste disposal achieved due to implementing recycling process.

  • 8 years without a reportable environmental incident.

  • Reduction of 50% in solid waste to landfill compared to 1993.

  • Reduction of 75% in water usage compared with 1993.

  • Two plants installing air emission filters and scrubbers to reduce organic emissions by 90 % and 25 %.

  • Switched packaging from non-returnable boxes that had to be land filled to returnable containers.

  • Switched from drums to bulk storage to eliminate drum usage.

  • On-site resin holding ponds decommissioned and site remediation completed at a cost of two million dollars.

  • 36% reduction in VCM emissions to air achieved due to product reformulation

  • No wastewater pollution guidelines exceeded for 4 years.

  • Reduced chemical wastes to landfill by 69% from 1995 to 1999.

  • Chemical Emission and Waste Data is presented annually to the community.

  • Chemical transfer stations installed with fume recovery systems to eliminate any effect on the environment.

  • Improved water effluent monitoring system.

  • Two heat reclaim projects reducing greenhouse gases by 11%.

  • Built new building to store raw material drums and tote bins to protect soil and groundwater in event of a leak. Cost $150,000.

  • Raw material bulk storage facilities installed at cost of $225,000 to eliminate used bags being sent to landfill. Landfill reduced approximately 25,000 lb. per year and safety improved by eliminating handling of 50-pound bags.

  • Water re-use projects are in the design phase to reduce water consumption by 25%.

 

 

niagaracaer.com